Others

STEAM TURBINE P 25-91/1,75E

STEAM TURBINE P 25-91/1,75E

General information: Name: Steam turbine P 25-9/1,75E- Turbine • 25MWe- In operation since 2016- Type: Extraction-Condensing- Running time 2016-2024- Steam pressure 9 MPa- Temperature 535 °C- Max steam amount 145 t / h- Normal steam amount 120 t / h- Controlled...

(3) GAS NATURAL BURNERS

(3) GAS NATURAL BURNERS

General information: - Tekener burner press work 150/200 bars, 870 to 220 NM/H year 2005- 2 x Babacock & Wanson year 2002, model G20 – 300 / 10432 (3) GAS NATURAL BURNERS

SCANPUMP FAN PUMP Z22 350/350.45

SCANPUMP FAN PUMP Z22 350/350.45

General information: - Built by Scanpump model Z22 350/350.45 JMW- Year 1988- Built on stainless steel- Flow 960 m3/h- H 37 mts- 1.485 rpm- No power motor included- Many spare parts also available (rotors, ….) SCANPUMP FAN PUMP Z22 350/350.45

SULZER FAN PUMP ZRS40

SULZER FAN PUMP ZRS40

General information: - Built by Sulzer model ZRS40- Flow 400 – 600 l/s (1.400 – 1.800 m3/h)- H 45 mts- Rpm 1.200 – 1.300 rpm- NO MOTOR INCLUDED- Pump in good condition and ready to load SULZER FAN PUMP ZRS40

GAS COGENERATION PLANT 4 – 5 Mw/H

GAS COGENERATION PLANT 4 – 5 Mw/H

General information: - Installed in 1997- Capacity 4 – 5 MW/h- Gas turbine Centrax- Gas consumption 1.500 Nm3/h- Boiler 13 Th/h at 15 bar built by Ergos- Diverter Orbinox- Control panels- Stopped in 2021 GAS COGENERATION PLANT 4 - 5 Mw/H

DEWATERING ELEMENTS

DEWATERING ELEMENTS

General information: - Built on 2017 just work 6 month- Ready to sell it Composed by:- 2 X forming board box 4.950 x 600 x 400 mm dewatering on polyethylene andsteel boxes on stainless steel- 8 X formation box 4.950 x 750 x 800 mm dewatering on ALOX ceramic andsteel...